Rank every asset by what its failure would actually cost, build the maintenance program those rankings justify, and carry it all the way into your CMMS.
The demo plant has this module switched on. Open it and look around.
Safety, environment, production, and cost - scored per asset with your own model, reviewed and approved before anything publishes.
Start from how the asset actually fails, decide what prevents or catches each mode, and keep the reasoning attached to every task.
Versions, approvals, and review dates. A strategy is a controlled document, because a wrong one costs bearings.
Lay your existing PM program against the failure modes it claims to manage. The tasks that map to nothing are cost without protection, and the gaps with no task are risk without cover.
Fourteen tasks protected nothing. That is a week of wrench time a year, back.
A binder on a shelf is not a maintenance strategy. The module exports to your CMMS, tracks what is actually deployed, and reports the whole program to the people who funded it.
Approved strategy actually loaded in the CMMS, area by area.
The asset registry you build for this module is the one every other module runs on. Add the next one and it starts loaded.
Investigations with cause trees, evidence, and corrective actions that actually close.
One number over every critical asset: healthy or at risk, and the named reasons why.
Stage-gate reliability readiness, so no machine starts up with ten years of problems already installed.
Tag every point, run every route, and catch a failing bearing while it is still a planning problem.
Who is qualified for which work, where the dangerous gaps are, and the plan that closes them.
The demo plant has assessments mid-flight and a strategy half deployed. Pick it up where a real one lives.