Stop handing maintenance new equipment with ten years of problems installed. 

Stage-gate reliability readiness for capital projects: evidence at every gate from concept to handover, verified against your own records - because the cheapest place to fix a maintainability problem is on paper, and the most expensive is at startup.

The demo plant has this module switched on. Open it and look around.

Gates with teeth

Concept, design, procurement, installation, commissioning, handover. A gate passes when its evidence exists - complete, ruled not applicable, or signed off as an exception. Never by silence.

Evidence, not checkboxes

Where the suite already holds the truth - criticality approved, lube points defined, spares listed, punch list clear - the requirement verifies itself against the record. Nobody can tick what the registry can see.

Your checklist, not ours

The starter set is a defensible baseline of the reliability work that dies quietly on most projects. Every line of it is yours to edit, per organization and per plant.

Born ready

The machine arrives with its care system running.

Project assets are created in the shared registry while the equipment is still on a truck - so criticality, strategy, lubrication and spares are decided before startup, not discovered after it.

  • Criticality and strategy approved before commissioning, in the same modules the rest of the plant runs.
  • Lube points defined with products and schedules, so the first service is already on a route when the machine starts.
  • Day one, it is watched like the rest: the new asset joins asset health, skills lanes, and the walk-arounds immediately.
Readiness, computed live
CPR-2025-014 Winder drive100%
CPR-2026-001 Shoe press86%
CPR-2026-002 Feedwater31%

Satisfied requirements over total, with exceptions visibly outside the number. An exception never reads green.

Decisions on the record

Gates are decided by people, and it shows.

The software never passes a gate. It shows the evidence, blocks the button while items stand open, and records who decided, when, and what the checklist looked like at that moment.

  • Exceptions are signed, not silent. A gap that passes a gate carries a reason, an approver, and a date - and keeps the project amber until it closes.
  • Punch severities have teeth: A is safety, B blocks startup, and the handover gate watches exactly those two.
  • Cost of ownership beside the purchase order: lifetime arithmetic on your own figures, because the purchase price is the smallest number on the invoice.
Lifetime cost, two pump sets
$0.0M$1.3M$2.5M$3.8M$5.0MStandardPremium

The dearer pump is the cheaper machine. Arithmetic on the project's own figures - never a recommendation.

Startup is too late to find out.

Walk the demo plant's pipeline: a project passing its gates on the registry's own evidence, and one being held honestly.