Role lanes, qualifications backed by evidence, and the risk dashboard that names the task resting on one person - before the resignation letter does.
The demo plant has this module switched on. Open it and look around.
A role is the work it is expected to cover. Each lane lists its skills and required levels, so "qualified" means something you can point at.
A qualification is granted against evidence - the certificate, the assessment, the sign-off. A matrix built on nods is a wish list.
Single points of failure, departure risk, and coverage gaps surface on a dashboard, ranked by how much they would hurt.
A plan exists because a gap exists: the skill the area is missing, the person leaving, the machine arriving. Progress is tracked against the matrix, not a spreadsheet.
Each bar is the plans that closed that quarter, showing up as coverage.
Plenty of plants need a real skills matrix before they need anything else. The module sells alone - and if the rest of the suite arrives later, the crew is already in it.
Ranked by how alone the last qualified person is.
The asset registry you build for this module is the one every other module runs on. Add the next one and it starts loaded.
Investigations with cause trees, evidence, and corrective actions that actually close.
Rank what matters, then build the PM program those rankings justify.
One number over every critical asset: healthy or at risk, and the named reasons why.
Stage-gate reliability readiness, so no machine starts up with ten years of problems already installed.
Tag every point, run every route, and catch a failing bearing while it is still a planning problem.
Open the demo plant's matrix and find the pale column. It takes one look.